Culvert Replacement & Road Drainage Enhancement
Hi-Tower was contracted to upgrade drainage infrastructure along Township Road 510 in Strathcona County, addressing water flow issues and road stability concerns. The Strathcona County Township 510 Drainage Project involved culvert replacement, excavation, and drainage cleanout to prevent future flooding and erosion. This work was critical in ensuring the long-term durability of the roadway while improving drainage capacity to handle seasonal runoff efficiently.
Project Scope & SolutionsCulvert Replacement: ○ Removed and replaced a 1,000mm culvert due to degradation. Excavation & Road Reconstruction: ○ Cut and removed existing asphalt layers to expose the drainage system. Reinforced Base & Paving: ○ Installed geo fabric to enhance ground stability and prevent future subsidence. Drainage Cleanout & Water Flow Optimization: ○ Conducted extensive drainage maintenance to clear debris and improve water movement. |
Ensuring Long-Term Drainage & Road Stability
The Strathcona County Township 510 Drainage project demonstrates Hi-Tower’s expertise in culvert replacement, excavation, and drainage engineering. By integrating advanced water management solutions, we ensured long-term stability for Township Road 510, protecting against seasonal flooding and infrastructure deterioration.
Commitment to Quality & Sustainable Infrastructure
At Hi-Tower, we prioritize long-term durability and sustainability in every infrastructure project. By using high-quality materials, precision engineering, and industry-best practices, we ensure that drainage systems and roadways remain resilient against environmental challenges. Our approach minimizes future maintenance costs while enhancing road safety and water management efficiency, providing communities with reliable and lasting infrastructure solutions.
Need Expert Drainage Solutions & Road Stabilization?
Contact Hi-Tower today for customized infrastructure solutions tailored to your project’s needs.