Slope Repair & Long-Term Stabilization in Edmonton
In May 2023, Hi-Tower was called in for an urgent slope stabilization project at 142nd Street & Anthony Henday Drive in Edmonton after a major slope collapse threatened the integrity of adjacent infrastructure. Partnering with Tetra Tech, our team worked swiftly to remove compromised materials, reinforce the slope, and implement long-term drainage solutions.
This two-phase project, completed in May and September, involved advanced geotechnical techniques, engineered slope reinforcement, and sustainable restoration efforts.
Project Scope & Engineering SolutionsPhase 1 (May – Emergency Stabilization) Phase 2 (September – Long-Term Stabilization) |
Ensuring Slope Stability & Infrastructure Protection
This project demonstrates Hi-Tower’s expertise in emergency slope stabilization, erosion control, and geotechnical engineering. By integrating geo grid technology, engineered drainage systems, and natural restoration, we delivered a long-term solution that will protect Edmonton’s infrastructure for years to come.
Integrating Fast Response with Long-Term Engineering
Hi-Tower’s ability to rapidly mobilize and deliver results under pressure was critical to the success of this project. From emergency response to permanent reinforcement, each step was carefully engineered and executed with minimal disruption. Our collaboration with Tetra Tech and commitment to best practices ensured the slope was not only stabilized but made resilient for the future.